Kitchen remodeling in Endicott, NY
Cabinets, counters, backsplash and floor — and the wall out to the living room if the house needs it.
Where the room goes wrong
Kitchens fail at the counter, not the cabinet doors.
Which is why the layout gets sorted before anything gets ordered.
- Layout first — where you actually stand, cook and put the bags down.
- Cabinets set level — on walls that got straightened first if they needed it.
- Counters and backsplash — templated, fitted and sealed properly.
- Floor and trim last — so the finish is not walked on for three weeks.
The finish
Rooms that got used the day after
Photography on this page is representative. Ask Joe for pictures of jobs he has finished near you.
Opening it up
Take the wall out and the house grows.
Structural work gets planned, not guessed. If it is load bearing, it gets carried properly.
What people ask for
Four jobs that come up most
Whole kitchens, and the smaller changes that make one workable.
- Full kitchenEverything out, new layout, new units, new floor.
- Counters and backsplashNew tops and tile over cabinets worth keeping.
- Wall openedKitchen and dining joined into one room.
- Island addedPrep space, storage and somewhere to sit.
Tell Joe what the kitchen is missing
A couple of photos and a rough idea is enough to start.